sMerit sent from The Planner to putra goromo

iThe sMerit report shows information about each sMerit transaction that BPIP has recorded between users. Specifying at least who the sMerit was sent "From" or who it was sent "To:" is required. Under the "Report Options" button, a minimum/maximum amount of sMerit involved and a date/time range can be specified.

Date/Time From To Number Post
8/8/2019 12:24:24 AM The Planner (Summary) putra goromo (Summary) 1 Re: New Bounty Table (professional design, full details, projects analysis & rank)

Sum of merit: 1
Total records: 1